Offshore

2002 – SSDR - SAIPEM SCARABEO 7

Basic design and Detail Engineering Bottom Production Module support on BOP Trolley

2002 – DRILLSHIP SAIPEM 10000

New reel platforms supports an BOP Guidepost extension

2003 – SSDR - SAIPEM SCARABEO7

New mud Pump Installation including piping stress analysis and DNV approval.
New cutting discharge, New ROV frame design
Thrusters saddles design and removal reinstallation procedures.
Length increase for the Well test flare booms
Works Supervision on site –Limbe, Cameroun

2004 – SSDR - SAIPEM SCARABEO3 for CNIC

Additional Living quarters design
Installation supervision in Limbe - Cameroun

2005 – SSDR - SAIPEM SCARABEO7

New ventilation system for Mud Pits area

2005 – DRILLSHIP SAIPEM 10000

Basic design and detail engineering for new Boat Landing system

2006 – Jack Up SAIPEM PERRO NEGRO 4 United Arab Emirates

Helideck Repair assessment, structural analysis and repair procedure
Detail engineering,
Repair and conversion works supervision.
Inclining Test and Trim and Stability Booklet including RINA approval
New Operating Manual.
Repair works and accommodations upgrading supervision.

DRILLING RIGS ACCOMMODATION UPGRADING (pdf)



 

 
AIMS Srl - Via XXIV Maggio, 61 – 19124 La Spezia - ITALY - Phone : + 39 0187 257078 - Fax : + 39 0187 257566 - P.I. IT01115190116