2002 SSDR - SAIPEM SCARABEO 7
Basic design and Detail Engineering Bottom Production Module support on BOP Trolley2002 DRILLSHIP SAIPEM 10000
New reel platforms supports an BOP Guidepost extension2003 SSDR - SAIPEM SCARABEO7
New mud Pump Installation including piping stress analysis and DNV approval.New cutting discharge, New ROV frame design
Thrusters saddles design and removal reinstallation procedures.
Length increase for the Well test flare booms
Works Supervision on site Limbe, Cameroun
2004 SSDR - SAIPEM SCARABEO3 for CNIC
Additional Living quarters designInstallation supervision in Limbe - Cameroun
2005 SSDR - SAIPEM SCARABEO7
New ventilation system for Mud Pits area2005 DRILLSHIP SAIPEM 10000
Basic design and detail engineering for new Boat Landing system2006 Jack Up SAIPEM PERRO NEGRO 4 United Arab Emirates
Helideck Repair assessment, structural analysis and repair procedureDetail engineering,
Repair and conversion works supervision.
Inclining Test and Trim and Stability Booklet including RINA approval
New Operating Manual.
Repair works and accommodations upgrading supervision.
DRILLING RIGS ACCOMMODATION UPGRADING (pdf)
